background image

NOVATEK-ELECTRO Ltd 
Intelligent industrial electronics 

 
 
 
 
 

 

 
 
 

 

TIME DELAY RELAY 
REV-114 

 
 
 
 

 
 

 
 
 
 

 

 
 
 
 

OPERATING MANUAL

 

 
 
 
 

The quality management system of development and production production complies with the requirements 

of  ISO 9001:2015 

 
 
 

Dear Customer, 

Company thanks you for purchasing our products. 

You will be able to use properly the product after carefully studying the Operating Manual. 

Keep the Manual throughout the service life of the product. 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

www.novatek-electro.in

 

Summary of Contents for REV-114

Page 1: ...m of development and production production complies with the requirements of ISO 9001 2015 Dear Customer Company thanks you for purchasing our products You will be able to use properly the product aft...

Page 2: ...OF THE CASE IT IS NOT ALLOWED WATER PENETRATION ON TERMINALS AND INTERNAL ELEMENTS OF THE PRODUCT During operation and maintenance the regulatory document requirements must be met namely Regulations...

Page 3: ...e delay relay REV 114 is the microprocessor based device intended to control the load with independent time delay It provides the certain sequence of the load operation according to the mode specified...

Page 4: ...17 Adjustment range of time from 0 1 s to 10 days Timing adjustment Buttons on the front panel Digit display of remaining time available Service of the product Switchgear and control gear Rated opera...

Page 5: ...ed for set time and the indicator is on During the delay time the indicator periodically is off At the end of the delay time the load relay contacts are open and the product starts fulfillment of algo...

Page 6: ...he indicator is off and the product goes into standby mode In case of repeated occurrence of the control signal S the algorithm fulfillment is repeated 8 Pulse I with external start After energizing t...

Page 7: ...ith external start and on delay After energizing the indicator ON Fig 1 it 10 is on and the product goes into standby mode in this case the load relay contacts C and NO are open and the indicator Fig...

Page 8: ...ts C and NO remain open and the indicator is off The product goes into the standby mode until power off 3 INTENDED USE 3 1 Preparation for operation Unpack the product we recommend to keep the origina...

Page 9: ...nd wire can burn If you increase the tightening torque it is possible to have thread failure of the terminal block screws or the compression of the connected wire Error when performing the installatio...

Page 10: ...is case the display will flash the current value of the selected time unit Using the buttons or set the required value Press the buttons one time to save the set value and return to the previous menu...

Page 11: ...t should be packed in the original or other packing excluding mechanical damage You are kindly requested in case of return of the product and transfer it to the warranty post warranty service in the f...

Page 12: ...12 REV 114 NOVATEK ELECTRO...