background image

B

K

N

A

E

C

Xtend 7818J Series

Assembly Instructions

Table of Parts

REF  Part Name

 

 

A

  Pole Cap (part of Pole Assembly) 

 

B

  VESA Plate

 

C

  Extension Arm Assembly 

 

D

  Base Assembly 

 

E

  Set Screw 

 

F

  Lower Clamp Bracket 

 

G

  Clamp Bolt 

 

H

  Upper Clamp Bracket 

 

I

  Grommet Mount Bolt 

 

J

  Joint Cap 

 

K

  Height Adjust Arm Cable Manager 

 

L

  Clamp Knob

 

M

  Clamp Pad

 

N

  Fixed Arm Cable Manager

 

O

  Clamp Pad Screw

N7800186_D

D

G

M

L

H

Adjusting the Xtend Arm:

1.  With the monitor mounted to the arm, move the monitor through  
  the height range; Ensure the arm will hold the monitor in the  
  position you placed it.

2.  If the monitor drops  
  or rebounds upward,  
  adjust the tension screws  
  at the front and back of the  
  arm segment as shown using  
  the 3/16” Allen key. Repeat steps  
  until the monitor is counterbalanced.

Adjusting the Joint Torque:

1.  Remove joint cap 

(J)

 from the  

  top of the joint using a small  
  flat head screw driver.
2.  Holding the bolt in the top  
  of the joint with a 9/16”  
  socket, use a second 9/16”  
  socket on the nut in the  
  bottom of the joint to  
  adjust the torque setting.

Adjusting the Tilt Tension

1.  If the monitor drops or is too tight, adjust the tension screw 

at the side of the head as shown using the 3/16” Allen key.

J

Using the Cable Managers:

1.  Remove cable managers 

(K & N)

  

  by pinching at release points.
2.  Lay cables in cable managers.  
  Make sure to leave enough slack  
  at every joint and base.
3.  Snap cable managers back  
  into place. Note text indication  
  “TOP” inside cable manager.

*

Grommet Mounting:

1.  Use Phillips screw driver to remove  
  the screws which attach the upper  
  clamp bracket 

(H)

 to base.

2.  Assemble lower clamp bracket 

(F)

   

  to furthest slots on upper clamp  
 bracket 

(H)

 to align clearance holes.

3.  Slide knob 

(L)

 on to long bolt 

(I)

.

4.  Lay monitor cables through grommet  
  holes  in the work surface.
5.  Align base on work surface. Install bolt  
 

(I)

 through the clearance holes on clamp  

 bracket 

(H)

. Insert the threaded end  

  through the grommet and into the pole  
  base, using knob 

(L)

 to tighten securely.

3.   Insert monitor cables through cable managers. 

4.  Mount monitor onto VESA Plate (B) using appropriate length screws provided.

5. Fine adjustments to the arm (optional).

K

M

F

L

G

D

Assembling Xtend Arm 
onto base:

1.  Align bushing gaps to be 

perpendicular with set screw 
before tightening.

*Release Points

2.  Mount arm assembly (C) to base and 

tighten set screw (E) for correct tension, 

followed by pole cap (A). 

Mounting base to work surface 
using the Clamp Mounting System:

1.  Slide knob 

(L) 

on to bolt 

(G)

,  

  ensuring the bolt head is securely  
  engaged into the knob.
2.  Screw bolt 

(G)

 in to the lower clamp  

 bracket 

(F) 

and using clamp pad  

 screw 

(0)

 attach clamp pad 

(M)

  

  to the end of the bolt 

(G)

.

3.  Hook lower clamp bracket 

(F)

 in  

  to one of the top 2 (of the 3)  
  positions provided.
4.  Position clamp bracket and base

 (D)

  

  onto work surface in desired location.
5.  Using knob 

(L)

 tighten securely.

1.  Mount base assembly (D) to work surface using either the clamp or grommet (see below).

1

H

O

H

F

2

3

L

I

5

H

I

L

Reviews: