ZURN INDUSTRIES, INC.
♦
♦
♦
♦
♦
COMMERCIAL BRASS OPERATION
♦
♦
♦
♦
♦
5900 ELWIN BUCHANAN DRIVE
♦
♦
♦
♦
♦
SANFORD NC 27330
Phone: 1-800-997-3876
♦
♦
♦
♦
♦
Fax: 919-775-3541
♦
♦
♦
♦
♦
World Wide Web: www.zurn.com
In Canada: ZURN INDUSTRIES LIMITED
♦
♦
♦
♦
♦
3544 Nashua Drive
♦
♦
♦
♦
♦
Mississauga, Ontario L4V1L2
♦
♦
♦
♦
♦
Phone: 905-405-8272 Fax: 905-405-1292
Package Contents:
1
2
3
5
6
8
3
1. Z5795 China Urinal
2. Strainer
3. Bell Trap and Bell Trap O-ring
4. Hanging Hardware
5. AquaGreen
TM
Sealant (2)
6. Drain Line Yoke Assembly
7. Brass Drain Line Flange Assembly
8. Wall Anchors
Required Before Installation:
Tools Recommended:
- Safety glasses
- Drill
- Screwdriver
- Tape measure
- Adjustable Wrench
New construction:
- Drain line complete and leak free, roughed-in per urinal rough-in dimensions.
- Refer to Installation.
Replacing a Urinal:
- Shut off water supply before removing supply stop.
- Verify there is enough room to mount the new fixture.
- Remove existing flush valve, fixture, and wall hanger brackets. Existing drain line flange can be
reused if appropriate.
- Cap off or remove water supply line.
- Clean wall of any caulk, grout or dirt remaining from the old urinal.
- Remove all traps or conventional siphons.
- Make sure drain line is complete and leak free.
Installation:
- Mark and mount wall brackets at locations per rough-in drawing, a Zurn carrier system Z1222
is recommended. Make certain there is adequate structural support to withstand the weight of
the urinal.
- Attach brass drain line flange (item 7) to drain line.
- Install drain line yoke w/ supplied nut and ferrule (item 6) to outlet tube of urinal.
- Hang urinal on wall brackets
- Adjust and attach flanged drain line yoke assembly (item 6) w/ foam gasket to the brass drain
line flange fitting (item 7) and tighten to studs.
- Tighten compression fitting nut and ferrule.
-Secure urinal to wall with wall anchors (item 8).
7
4