For Tile Installation (Steps 13 and 14)
If finished fixture is tilted, See Step 15
Round
13. Adjust head assembly to the height of the finished floor.
See Fig. 13R
14. Install finish flooring per manufacturers instructions.
Remove protective label from strainer once construction is
complete.
See Fig. 14R
Square
13a. Adjust head assembly to the height of the finished floor.
See Fig. 13S
13b. Fill in shroud with cement or grout. Ensure to completely
fill in around entire head assembly flush with finished
concrete. See Fig. 13S
14. Install finished flooring per manufacturers instructions.
Remove protective label from strainer once construction is
complete.
See Fig. 14S