EZ1
TM
DRAINAGE SERIES
EZ1
TM
FLOOR DRAIN INSTALLATION INSTRUCTIONS
Zurn Industries, LLC
|
Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada
|
Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
Rev.
C
Date:
02/27/2018
C.N. No.
139680
Form No. FD97
Page
1 of 6
®
Fig. 1
1. Cut pipe so that the height of the finished drain is at or just
below the height of the finished floor. (See Zurn Engineering
Handbook or EZ1
TM
Submittal for dimensional heights). Ensure
pipe is cut square and free of burrs or debris. See Fig. 1
2. Install drain body on pipe and pressure test connection per local
code requirements. See Fig. 2 (Neo-loc body shown for
reference)
Note: All plastic bodies to be solvent welded to pipe
3. Pour the rough floor slab flush with the top of the drain body.
See Fig. 3
Fig. 2
Fig. 3
Warning: Flying material can cause eye injury or blindness and sharp edges could cause cuts or
lacerations. Wear safety glasses and gloves when installing or working on drain.
WARNING
: Cancer and Reproductive Harm -
www.P65Warnings.ca.gov
ADVERTENCIA:
Cáncer y daño reproductivo -
www.P65Warnings.ca.gov
AVERTISSEMENT:
Cancer et effets néfastes sur la reproduction -
www.P65Warnings.ca.gov