Membrane
Fig. 4
Fig. 6
Fig. 5
4. Install the waterproofing membrane per the manufacturers
instructions. See Fig. 4
Secure the clamp collar to the body with the supplied 3/8-
16 x 3/4 hex washer head cap screw. (Do not overtighten,
Max. torque 8 ft-lbs [11 Nm])
Note: Clamp collar can be inverted for a lower rough-
in height.
5. Install rough-in cover assembly into clamp collar.
Adjust rough-in cover assembly so the top of the rough-in
cover is at the finish floor grade. See Fig. 5
Note: Ensure rough-in cover is tight to the concrete
shield so no concrete seeps into the assembly
6
Pour finish floor slab flush to the top of the rough-in cover.
See Fig. 6
Note: If fixture is above floor surface, it is recommended to
hand finish concrete around fixture to avoid damage.
No Gap