SJ-20110104194923-001|2011-1-15(R1.0)
ZTE Proprietary and Confidential
ZXSDR R8882 L200 User Manual
The supplier should be responsible for inspecting the devices and instruments that are
easy to be damaged.
Separate the inspected parts by category.
2.2.2 Goods Handover
After equipment inspection both the parties should sign the Unpacking and Inspection
Report with each party keeping a copy, with the top copy returned within seven days to the
vendor.
Caution!
If any goods are found to be wrong, missing, or damaged, record the details on the form
and ask for replacements.
2.3 Device Installation
2.3.1 Mounting Device on Wall
Prerequisites
Before installing ZXSDR R8882 L708, you should at least leave the following space for
product future maintenance.
z
Front
side:
600
mm
z
Back
side:
40
mm
z
left and right side: 100 mm
z
UP and down side: 250 mm
Steps
1. Mark
on
installation
positions based on layout marking template on wall, as shown in
Figure 3-1
, and then drill holes.
3-6