SJ-20110104194923-001|2011-1-15(R1.0)
ZTE Proprietary and Confidential
Chapter 2 Product Installation
Figure 3-43 Remove Covers
3. Insert the optical fiber into the
OPT1
port until it locks into place with a snap, as shown
in
Figure 3-44
.
Figure 3-44 Insert Optical Fiber
4. Insert
the
transparent
sleeve
into the OPT port fully, as shown in
Figure 3-45
.
Figure 3-45 Insert Transparent Sleeve
5. Tighten the outer protection cover fully.
3-31