SJ-20110104194923-001|2011-1-15(R1.0)
ZTE Proprietary and Confidential
ZXSDR R8882 L200 User Manual
Figure 3-27 Fasten the Vertical Shaft and the Cover Plate
c. Install the slanted rack by using the M5x16 screw, as shown in
Figure 3-28
.
Figure 3-28 Install the Slanted Rack
2. Drill
holes
a. According to the engineering design drawing, determine the installation position
of the gantry and mark installation holes by using the marking pen.
Figure 3-29
shows the installation holes of the gantry.
3-20