![Zte ZXSDR BS8908 G060 User Manual Download Page 66](http://html1.mh-extra.com/html/zte/zxsdr-bs8908-g060/zxsdr-bs8908-g060_user-manual_940278066.webp)
ZXSDR BS8908 G060 User Manual
grounding terminal, and end B of the cable is the round metal bare terminal, which is
called cabling lug or copper lug, as shown in
Figure 5-30 Grounding Cable Structure
Steps
1.
Hang the copper lugs at end A of the grounding cable on the two grounding bolts of
the BS8908 cabinet, and fix them.
2.
Connect the copper lug at end B of the grounding cable to the copper bar of the
grounding network, and fix it with the bolt, as shown in
.
Figure 5-31 Copper Bar of Grounding Network
3.
Paste the label on the grounding cable.
4.
Test the grounding resistance, and make sure that the resistance is less than 5 Ω.
– End of Steps –
5.7.5 Installing Abis E1 Cable
Prerequisites
Wear the antistatic wrist strap.
The BS8908 cabinet is installed and fixed.
5-36
SJ-20101104174421-001|20110425(R1.1)
ZTE Proprietary and Confidential
Summary of Contents for ZXSDR BS8908 G060
Page 5: ...Glossary V III ...
Page 6: ...IV ...