![Zte ZXSDR BS8800 C200 Installation Manual Download Page 90](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276090.webp)
ZXSDR BS8800 C200 Installation Manual
4. Put a spring ring into the wave trough on the outer conductor.
5. Press a foam material inside the connector from the outer con-
ductor to the inner conductor forcibly.
6. Insert an end of connector assembly into the inner conductor
carefully and install it, as shown in
F
IGURE
63 C
ONNECTION
7. Move the connector assembly onto the fastening piece round
and round. During operation, keep the connector assembly
unmovable and only rotate the fastening piece with a wrench.
Clear away copper scraps on the foam material with a brush,
especially cooper scraps on the cross section of the foam ma-
terial, as shown in
.
F
IGURE
64 C
OPPER
S
CRAP
C
LEARNESS ON THE
C
ROSS
S
ECTION
8. Take apart the connector and check the profile state of outer
conductor. The profile of outer conductor should be orderly and
clean. While disassembling the connector, first unscrew the
connector assembly in an 1/4 circle, then keep the connector
assembly unmovable and only rotate the fastening piece with
a wrench, as shown in
.
82
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXSDR BS8800 C200
Page 6: ...List of Glossary 159 ...
Page 9: ......