![Zte ZXSDR BS8800 C200 Installation Manual Download Page 132](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276132.webp)
ZXSDR BS8800 C200 Installation Manual
Steps
1. Confirm a proper jumper route which should be reliable, con-
venient, short as possible it can. Make sure rain drop in the
middle of jumper but not at the connector.
2. Make sure a proper torque (connection torque of DIN is 1.7 N.m
typically and the maximum value is not more than 2.3 N.m) to
connect a connector between antenna and jumper. And make
sure this connector no lateral force, as shown in
F
IGURE
114 J
UMPER
C
ONNECTION
3. Make sure a proper torque (connection torque of DIN is 1.7 N.m
typically and the maximum value is not more than 2.3 N.m) to
connect a connector between main feeder and jumper. And
make sure this connector no lateral force.
4. Fix the jumper with feeder kits, as shown in
. The
distance of feeder kits is not beyond 0.76 m. When the speed
of wind is over 160 km/h, shorten the distance between feeder
kits appropriately.
F
IGURE
115 F
EEDER
K
IT
F
IXATION
124
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXSDR BS8800 C200
Page 6: ...List of Glossary 159 ...
Page 9: ......