![Zte ZXSDR BS8800 C200 Installation Manual Download Page 138](http://html1.mh-extra.com/html/zte/zxsdr-bs8800-c200/zxsdr-bs8800-c200_installation-manual_940276138.webp)
ZXSDR BS8800 C200 Installation Manual
F
IGURE
120 F
EEDER
L
AYOUT FROM
T
OWER
T
OP TO
H
ERMETIC
W
INDOW
1.
Interval between fixation kits
2.
Fixation kit
3.
Feeder hermetic window
Installing Feeder on Roof
Steps
1. Make sure feeder marks correct affixed to two ends of feeder .
2. According to the labels, fix the feeder into feeder fixation clips.
Screws on the fixation clips are not fastened temporarily. After
completing feeder layout, screw down these screws.
The fixation clips should keep vertical with the feeder. The
feeders in a fixation clip should keep paralleled mutually, as
shown in
130
Confidential and Proprietary Information of ZTE CORPORATION
Summary of Contents for ZXSDR BS8800 C200
Page 6: ...List of Glossary 159 ...
Page 9: ......