8
Electrical Connection and Power-up
DANGER
DANGER
indicates an imminently hazardous situation
which, if not avoided, will result in death or serious injury.
Note: This operation must be performed by a
qualified technician or electrician in accordance with
your local electrical safety code.
Installation Option 1: Connect via supplied input plugs
1.
Have appropriate power whips or busway tap boxes with
receptacles that match your Z-PDS model deployed and
tested.
2.
Ensure all Z-
PDS breakers are all in the “off” or “0” position
during installation.
3.
Consider de-energizing the power input sources for both A
and B, if possible. Follow all applicable safety regulations.
4.
Connect the input power to the Z-PDS using the supplied
input cord plugs.
5.
Safely energize the input power whips or busway tap boxes
for the Z-PDS A & B inputs.
6.
Toggle “1 / ON”
for all circuit breakers to ensure all the LEDs
are illuminated. If any malfunctions occur at this point
please reference the troubleshooting section of this guide.