6
Installation
Pre-Installation Considerations
Prior to deployment of the Z-PDS, the following site considerations
should be reviewed to ensure the Z-PDS will function properly in its
intended application.
Shipped Items List:
1.
(1) Z-PDS w/ standard attached A-B labeled input 10 ft.
power cords
2.
(2) Rack Mount Brackets
3.
(8) Bracket Mounting Screws
4.
(2) Input Connectors As Ordered (either a. or b.)
a.
(2) Plugs on the A-B 10 foot input SJTW cords.
b.
(2) Hard-Wire Assembly Modules attached to the A-B
10 ft. input SOOW cords.
5.
(1) User Manual