INSTALLER SIGNATURE Date
V3R SYSTEM CHECKLIST
12
Customer:
Yard:
Date:
Asset #:
Installer:
Location:
GPS ID:
Vehicle Odometer Value:
Vehicle I.D. (e.g., Vin, Plate#, Make, Model, Year)
Vehicle Hour Meter value (if monitoring engine hours)
System Check
Value
Notes
General Layout
General condition - components level, even, straight, etc?
System layout conforms to your established standard?
Drilling and Cutting
All drill holes grommeted (or otherwise protected), deburred,
sealed (weather penetrations only)
All chips captured?
Cable Management
All cables properly ran (tight radius, interference, strain
relieved, supported, service looped)?
Electrical
System hookup complies to your established standard?
Red lead voltage verified? (8 -30V constant)
White lead voltage verified? (8 -30V engine on, 0V engine off)
Black lead continuity verified? (Grounded to vehicle chassis)
Crimp integrity verified?
Fuse holder and fuse installation verified?
Ground Traffic Control™ System checkout
Cold start present?
Power-on check
Power-off check
Idle time check? (Requires an idle of over 1 minute)
GPS Position uploaded to GTC website?
Post Job
Key accounted for?
Vehicle secure?
Lights, electrical off?
All debris, refuse, chips removed?