3
3-GENERAL INFORMATION
1) Main Unit Construction
1. Top cover
2. Door for ice taking
3. Ice-making & its water tank assembly: Including ice-making evaporator, water tank,
water pump and some detecting parts.
4. Front panel
5. Operation panel
6. Air outlet: Must keep the air circulate smoothly, hot air will blow out when unit
running.
7. Water draining port: Normal plugged with the cap. When need to drain the water,
unplug the cap, and connect the white drain pipe.
8. Water inlet port for water supply: Use to connect the water supply pipe.
9.Accessory
1) 2 meters long white water drain pipe.
2) Water quick connector of the water faucet.
3) 3 meters long white water supply pipe with ¢6.35mm diameter.