11 / 12
E
N
G
L
I
S
H
EQUIPMENT ASSEMBLY
OARS
1.blade
2.oar shaft
3.rowlock
4.groove
5.rowlock socket
6.thumbwheel
6
4
5
To assemble the oars
,
insert the oar shaft into the blade and
rotate until the stop notch is engaged.
To position the oars in the rowlocks: (
Caution, the port and starboard oars are different;
do not reverse them):
A.
Insert the rowlock into the corresponding hole in the rowlock socket.
x
When the oar blade is pointing
inboard
,
x
The rowlock groove must point
aftwards
.
B.
Rotate through 180 degrees to row. Make sure that the oar is securely locked in the rowlock
socket.
C.
Bring the blade towards the aft of the buoyancy tube and engage the shaft in the attaching mount
located aft of the buoyancy tube.
A
B
C
THWART
Install the thwart before completing inflation.
Summary of Contents for ZOOM 230 Roll Up
Page 2: ......
Page 4: ......
Page 65: ......
Page 72: ... Copyright ZODIAC INTERNATIONAL 2011 1 Quai de GRENELLE 75015 PARIS France ZT03762 Edition 11 ...
Page 73: ......