3 / 12
E
N
G
L
I
S
H
ASSEMBLY PROCEDURE
The boat assembly procedure follows an order you must respect. Proceed step by step, referring each
time to the pages indicated for explanations.
PROCEDURE
PAGE
SECTION
1. Make an inventory of the parts of your boat and get
to know them.
3
CHECK ON UNPACKING
I - VI
DESCRIPTION
2. Activate the valves in the inflating position
Slightly inflate the main buoyancy tube
7
INFLATION SYSTEM
8 - 9
INFLATING THE BOAT
3.
ZOOM S
: Assemble the
floorboard and the
stringers
5 - 6
BOAT ASSEMBLY
ZOOM 230
: Install the battens
ZOOM AEROTEC:
Inflate the floorboard.
4
4
4.
I
nstall the thwart.
11
EQUIPMENT ASSEMBLY
5. fully inflate the boat to the correct pressure
pressure.
8 - 9
INFLATING THE BOAT
10
PRESSURE
6. Install the oars
11
EQUIPMENT ASSEMBLY
CHECK ON UNPACKING
CAUTION
DO NOT USE A SHARP TOOL
(CUTTER, KNIFE, ETC.)
The pack must contain 1 buoyancy tube +:
ZOOM
by Zodiac
230
Roll Up
260
Aero
260 - 310
Solid
350
SP Alu
400 – 450
SP Alu
Battens
X
Navy plywood floorboard
X
Aluminium floorboard
X
X
Aerotec inflatable floorboard
X
Inflatable keel
X
X
X X
Stringers
X
X X
STANDARD EQUIPMENT
Oars
2 2 2 2
2
paddles
Inflator
1
1 1
1
1
Removable thwart
1 1 1 1 1
Bag
1 1 1 2 2
Repair kit
1
1 1
1
1
Owner's manual
2
2 2
2
2
You can equip your boat with many optional accessories (transportation wheels, ladder, lifting rings
etc.). Ask your dealer to advise you.
NOTE:
IF YOU WANT TO ADD LIFTING RINGS (FOR DAVIT HANDLING), YOU
MUST SECURE THEM TO THE BUOYANCY TUBES, NOT ON THE
FLOORBOARDS (EXCEPT FOR THE ZOOM 400 SR, SEE "LOCATION
OF ACCESSORIES").
Summary of Contents for ZOOM 230 Roll Up
Page 2: ......
Page 4: ......
Page 65: ......
Page 72: ... Copyright ZODIAC INTERNATIONAL 2011 1 Quai de GRENELLE 75015 PARIS France ZT03762 Edition 11 ...
Page 73: ......