24 / 47
INSTALLATION AND CIRCUIT - Electricity
-
The light + bilge pump switches (also supplied).
-
The fuel gauge holder.
IV-2-5 Wiring preparation
IV-2-5-1 Installing the feedthrough (supplied)
WARNING
WHEN DRILLING, BE CAREFUL WITH THE TANK
LOCATED JUST UNDERNEATH.
1-Drill in the corner (grey area)
3- Present the clamp to pre-drill
the deck, then drill.
4 -Thread the feedthrough, the
clamp and then attach everything
to the deck.
(Seal the screws and
underside of the feedthrough
properly)
2- Find the electrical cables of the
prewired harness.
Mark 5
Summary of Contents for PRO 850
Page 2: ...Page 1 48 F R A N C A I S Manuel du Propri taire Tome 2...
Page 7: ...Page 6 48 ATTENTION NE PAS UTILISER DE NETTOYANT AGGRESSIF A BASE DE SOLVANT COMME L ACETATE...
Page 48: ...Page 47 48 F R A N C A I S...
Page 49: ...Page 48 48 EMPLACEMENT ACCESSOIRES OPTIONNELS VI 1 6 Position accessoire T TOP...
Page 98: ...47 47 E N G L I S H...
Page 105: ...Pagina 5 47 E S P A O L...
Page 147: ...Pagina 47 47 E S P A O L POSICI N ACCESORIOS OPCIONALES VI 6 Posici n del accesorio T TOP...
Page 195: ...Pagina 46 di 46 POSIZIONAMENTO DEGLI ACCESSORI OPTIONAL VI 1 6 Posizione accessorio T TOP...
Page 244: ...Seite 47 47 D E U T S C H EINBAUSTELLEN DES OPTIONALEN ZUBEH RS VI 1 6 Einbaustelle T TOP...