5
2.4 Installation of the Sensor POD
1. Use a straight section of horizontal pipe located past
all other equipment including pump, filter, heater etc
(30 cm long is best).
2. POD should be installed so that once the sensor is
fitted it is in an upright position
3. Disassemble sensor POD to get lower part of POD
clamp with 2 holes (picture 1).
4. Place the lower part of POD clamp upside down into
position on the selected length of piping.
5. Now mark the location of the 2 holes to be made into
piping using a pencil or marker (picture 2).
6. Drill the 2 holes using the provided hole saw. Ensure
that holes are perfectly smooth around the edges
(picture 3).
7. Position the upper part of POD clamp by sliding it into
the 2 previously drilled holes
NOTE: arrows on upper part of POD clamp
indicate direction of water flow
8. Interlock the lower part of POD clamp onto the upper
part already in place on piping. (picture 4).
9. Fit the POD cap on top of upper POD clamp, re-fit
locking ring and tighten firmly using provided tool
ensuring the locking ring thread is seated properly
before tightening.
10. Install sensor into position by firmly screwing into the
POD cap in the space allocated. (use Teflon tape on
thread)
11. Connect the sensor with the provided cable to the
control box.
Injection tube fitted
to one way valve
Sensor fitted in POD
1
2
3
4