2. DEEP END EXCAVATION
21
All layout measurements and component assembly methods for both deep end and standard oval pools are shown in the Noosa
Reef Oval Instruction Manual.
The installation of a deep end pool involves a few more steps regarding site excavation. Site excavation plans and measurements
relevant to each model are shown below.
DIAL 1100 BEFORE YOU DIG
Make sure even after any Council approvals that there are no pipes or cables in the excavation area.
Although, shown here in very sharp, straight lines the finished preparation of compacted sand would desirably soften the changes of
angle as gradually and as smoothly as possible as to reduce the chance of wrinkling in the liner.
Y
X
Y
X
Gro
un
d Level
Pool Wall
Pool Wall
3010
2360
3500
4640
6920
1000
2170
2590
2590
2590
2590
700
500
500
6850 x 4766
7990 x 4766
9130 x 4766
11410 x 4766
7080 x 3856
200
200
NOOSA REEF DEEP END EXCAVATION PLANS
1. SIDE VIEW
Summary of Contents for NOOSA REEF
Page 10: ...ENLARGED VIEW OF COMPONENTS 8 F2 B2 K C F1 G B1 A2 J D2 E A1 L I...
Page 22: ...20 Noosa Reef Deep End Excavation Channel Assembly...
Page 39: ...WALL ASSEMBLY 37 Wall Short Wall Long STEP 27 Control Notch Control Notch...
Page 45: ...DECK ASSEMBLY 43 7 99m x 4 57m 6 85m x 4 57m LONG TOP DECK LONG TOP DECK...
Page 56: ...54 Backfill Requirements for Noosa Reef Inground Installation...