Chapter 2 Installation
2.1Before the installation, it is necessary to check the device first
1)
Connect the wires between master and slave devices.
2)
Turn on the air switch to test whether the device is working properly, wait for 10 seconds for the gate to
complete self-test program. At the same time check whether the indicator light working properly. If
everything is normal, you can start the installation procedures
,
If an exception occurs, please contact
your vendor for information.
2.2Cables Installation
F
or the outlets of the concealed cables, please refer to the drawing showing the mounting holes. The input
voltage for this swing barrier turnstile is AC100-120V/200-240V and its master and slave are connected by a
6-core cable. When installing this swing barrier turnstile, the user only needs to connect it to the
corresponding ports. Note that the PVC conduits are buried 100mm below the ground, with the height of the
exposed part more than 100mm.