1
Chapter 1 Overview
1.1Preparation
1)
Cut a slot from the floor with a proper tool. The depth and width should be approximately 100mm and
30mm.
2)
Put the wire through the pipe.
3)
In order to avoid the impact on communication, 220V/110V power line (high voltage) and signal line
(low voltage) should be separated. The ground wire must be connected.
ProEntrance series SB installation holes and cabling positions as shown in Figure 1-1
Figure 1-1