CMP-300
User Manual
P a g e
| 20
Copyright©2021 ZKTECO CO., LTD. All rights reserved.
8
Commissioning Instructions
1)
Check all the connections and make sure the connections are correct
before connecting the power.
2)
Please use the remote control or press the switch button on the
mainboard to test whether the machine is running normally.
3)
Warning
: Be sure to install the corresponding length of the boom
before the power-on test. To avoid accidents, no one is allowed to stand
under the boom during testing.
4)
In the process of boom falling, short connect the infrared detector and
public interface, so that the falling boom will start rising immediately,
and will stop automatically after the rising limit. This is mimic the effect
of infrared detectors.
5)
In the process of boom falling, short connect the loop detector and
public interface, the falling boom is transferred to rising immediately,
which will fall automatically after the rising limit and stop automatically
after the falling limit. In the process of boom rising, short connect the
loop detector and public interface, the boom will fall automatically after
the rising limit and stop automatically after the falling limit. In the open
state, short connect the loop detector and public interface; the boom
will automatically fall to the limit and stop.
This is imitate the effect of
the loop detector.
6)
Barrier gate Hall limit switch adjustment: