background image

CMP-300

 

                

User Manual 

 

P a g e

 | 11 

Copyright©2021 ZKTECO CO., LTD. All rights reserved. 

 

Install the boom to the chassis (the frame), as shown in Figure 2. 

 

Figure 2 Installing the Boom to the Chassis 

 

 

Summary of Contents for CMP-300

Page 1: ...uct Please read the instructions carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual are for illustrative purposes only For further details please visit our Company s website www zkteco com User Manual CMP 300 Date March 2021 Doc Version 1 0 English ...

Page 2: ... property of ZKTeco The contents hereof should not be used or shared by the receiver with any third party without express written permission of ZKTeco The contents of this manual must be read as a whole before starting the operation and maintenance of the supplied equipment If any of the content s of the manual seems unclear or incomplete please contact ZKTeco before starting the operation and mai...

Page 3: ...rformance obtained from using the information is assumed by the user ZKTeco in no event shall be liable to the user or any third party for any incidental consequential indirect special or exemplary damages including without limitation loss of business loss of profits business interruption loss of business information or any pecuniary loss arising out of in connection with or relating to the use of...

Page 4: ...he rate limits iii in case of operation of the machine and equipment in conditions different from the prescribed conditions of the manual The product will be updated from time to time without prior notice The latest operation procedures and relevant documents are available on http www zkteco com If there is any issue related to the product please contact us ZKTeco Headquarters Address ZKTeco Indus...

Page 5: ...nt research and development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication fields With the continuous enhancement of the development and plenty of market applications the team has gradually constructed an identity authentication ecosystem and smart security ecosystem which are b...

Page 6: ...ion Button or key names for devices For example press OK Window names menu items data table and field names are inside square brackets For example pop up the New User window Multi level menus are separated by forwarding slashes For example File Create Folder Symbols Convention Description This implies about the notice or pays attention to in the manual The general information which helps in perfor...

Page 7: ...ION 7 2 WHAT IS IN THE BOX 7 APPEARANCE AND DIMENSIONS 8 3 PRODUCT INSTALLATION 9 INSTALLATION PRECAUTIONS 9 CABLE EMBEDDING 9 BOOM INSTALLATION 10 4 TECHNICAL PARAMETERS 12 5 FUNCTIONS 13 6 MOVEMENT TRANSMISSION STRUCTURE 14 7 CONTROL BOARD WIRING INSTALLATION 15 8 COMMISSIONING INSTRUCTIONS 20 9 TROUBLESHOOTING 23 ...

Page 8: ...equirements and the traffic light indication has the humanized experience As an economical automatic barrier gate device the user can adjust the telescopic straight boom according to the actual requirement to meet various application scenarios Note The intensivity of the product is 30 low intensivity it is suitable for places where traffic flow and people flow are not dense 2 What is in the box Th...

Page 9: ...CMP 300 User Manual P a g e 8 Copyright 2021 ZKTECO CO LTD All rights reserved Appearance and Dimensions ...

Page 10: ...g is designed for adjusting the new balance Do not change the wire connection inside when the power is on The GND should be connected to the cabinet for secure protection Cable Embedding Prepare φ25 protective sleeve and cable in advance Route the cables to be connected through the protective sleeves Use a tool to open the cable board in the ground Control room Screw pad Ground Cabinet Expansion b...

Page 11: ...021 ZKTECO CO LTD All rights reserved Boom Installation Boom Installation Procedure Pull the barrier arm out from the main boom and then fasten it with 2 screws as shown in Figure 1 Figure 1 Connect the main boom with vice together by 2 screws ...

Page 12: ...CMP 300 User Manual P a g e 11 Copyright 2021 ZKTECO CO LTD All rights reserved Install the boom to the chassis the frame as shown in Figure 2 Figure 2 Installing the Boom to the Chassis ...

Page 13: ...s material Cold gadolinium steel plate Boom material Aluminum Working temperature 25 C 75 C Working humidity 90 RH no condensation Protection grade IP54 Shell size W D H 1020 350 280 mm Package size W D H 1100 375 430 mm Chassis net weight 45KG Chassis gross weight 47KG Boom type The mainboard is the same Telescopic straight boom boom length 4 5m red and white color the rise fall speed is 3s Teles...

Page 14: ...ection When the boom operation is abnormal and exceeds the rise and fall time the boom will stop the operation automatically The barrier gate can be controlled by wireless remote control and wired control buttons to meet the needs of different field applications It supports traffic lights with AC voltage and DC voltage of 5V or 12V Mainboard built in fuse secure from overvoltage Supports the conne...

Page 15: ...CMP 300 User Manual P a g e 14 Copyright 2021 ZKTECO CO LTD All rights reserved 6 Movement Transmission Structure ...

Page 16: ... the barrier gate controller and connect the lines one by one firmly Note Power must be disconnected before installation or maintenance After checking and confirming reliable wiring install the wiring cover back Install the Desktop Remote Control Place the Desktop Remote Control on the table in the guard room or attach it to the wall and plug in the power The wiring diagram of the controller is as...

Page 17: ...CMP 300 User Manual P a g e 16 Copyright 2021 ZKTECO CO LTD All rights reserved ...

Page 18: ...17 Copyright 2021 ZKTECO CO LTD All rights reserved Connect to the LPR camera Connection with the UHF controller Note The Reader1 and 2 of the inbio260 controller are corresponding to LOCK1 Reader3 and 4 are corresponding to LOCK2 ...

Page 19: ...CMP 300 User Manual P a g e 18 Copyright 2021 ZKTECO CO LTD All rights reserved Connection with the loop detector Connection with VR10 radar ...

Page 20: ...CMP 300 User Manual P a g e 19 Copyright 2021 ZKTECO CO LTD All rights reserved Connection with the infrared detector Only Anti smash function Anti smash and auto closing function ...

Page 21: ...that the falling boom will start rising immediately and will stop automatically after the rising limit This is mimic the effect of infrared detectors 5 In the process of boom falling short connect the loop detector and public interface the falling boom is transferred to rising immediately which will fall automatically after the rising limit and stop automatically after the falling limit In the pro...

Page 22: ...CMP 300 User Manual P a g e 21 Copyright 2021 ZKTECO CO LTD All rights reserved 7 Left and right movement interchange method ...

Page 23: ...tton on the remote control the REMOTE indicator turns OFF In this process the code of studying will be completed Delete code To process the Code deletion in the STOP state press the Study button on the main controller until the REMOTE indicator is ON continue to press the Study button and hold on until the REMOTE indicator is OFF Note All the codes will be deleted in this process Note One barrier ...

Page 24: ...me frequency interference exists 1 Recode 2 Replace the receiving module 3 Change to other frequencies 3 The POWER indicator is on the boom UP and DOWN indicator is normal the motor is not running 1 The motor wire is open or incorrectly connected 2 The motor is stuck 1 Connect the motor wire 2 Manual release motor 4 Unable to rise or fall boom to limit 1 The limit line is misconnected 2 Limit swit...

Page 25: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2021 ZKTECO CO LTD All Rights Reserved ...

Reviews: