CMP-300
User Manual
P a g e
| 10
Copyright©2021 ZKTECO CO., LTD. All rights reserved.
Boom Installation
Boom Installation Procedure
•
Pull the barrier arm out from the main boom, and then fasten it with 2
screws as shown in Figure 1.
Figure 1 Connect the main boom with vice together by 2 screws