Cabinet Assembly
On the front right side of the cabinet, locate the
3 pairs of pre-drilled holes. This is where the
front right support attaches to the bottom of
the cabinet. Ensure that the open corner of the
support is facing inwards, towards the back left
corner of the cabinet.
Line up the six pre-drilled holes. Wood dowels
have be pre-installed to insure proper
alignment.
Attach the front right support to the inside of
the cabinet with the machine screws.
7
4
6
5