Zip VP303 Installation, Maintenance And User Instructions Download Page 11

The appliance has a working thermostat adjustable between 37ºC and 75ºC.
An over temperature cut-out is incorporated within the thermostat which is
designed to operate at 79-84ºC. Should this happen, press the reset button. 

Important: Before resetting the over temperature cut-out or altering the
thermostat setting, isolate the electrical supply to the unit before
removing the electrical cover panel. Ensure that the cover panel is
replaced correctly and the retaining screws fitted before re-connecting
the electrical supply.

Commissioning

1. Check that all the requirements under “Installation Requirements” have

been met.

2. Check that all water and electrical connections are correct and tight

3. Check that the expansion vessel pressure is correct – refer to label on     

vessel for correct pressure

4. Check that the drain valve on the inlet manifold is closed

5. Open hot water taps

6. Open the cold water supply valve and permit the heater to fill

7. Leave hot taps open until all air has been purged from the system and water

is flowing freely from all outlets

8. Check for leaks and rectify as necessary

9. Check the operation of both the T&P relief valve and the Expansion Relief 

Valve to ensure free water flow through the discharge pipe by turning the 
knob to the left and holding in the open position

10. Set the thermostat(s) to the desired temperature setting. A water

temperature of approx. 55ºC is recommended for economical operation 
while minimising lime-scale deposits and thermal losses. 

11. Switch on the electrical supply to the unit. The pilot light will illuminate to

indicate that the elements are operating.

12. During the heating cycle no water should escape to waste from either the

expansion relief or T&P relief valves

13. Allow the heater to reach the selected temperature when the pilot light will 

extinguish. Check the water temperature and re-check water connections
adjusting as necessary

14. Pass these instructions to the person responsible for the building

management

12

Zip Varipoint III Installation, Maintenance and User Instructions - August 2008  

Varipoint qxd:Varipoint qxd  22/8/08  11:09  Page 10

Summary of Contents for VP303

Page 1: ...mencing installation of the Varipoint unvented water heater Please leave these instructions with the end user after installation Zip Heaters UK Ltd 14 Bertie Ward Way Dereham Norfolk NR19 1TE Telephon...

Page 2: ...a current Registered Operative Identity card for the installation of unvented domestic hot water storage systems issued by an accredited body The Zip Varipoint must be installed in accordance with the...

Page 3: ...External expansion vessel pre charged to 3 5 bar Expansion vessel capacity 5 litre 30 and 50L Varipoint 8 litre 80 and 100L Varipoint Approvals Zip Varipoint III complies with the LVD and EMC directi...

Page 4: ...water supply To drain via tundish Hot water outlet 1 2 9 3 4 5 6 7 8 1 Temperature and pressure relief valve 2 Combined pressure reducing valve and strainer 3 Expansion relief and check valve 4 Balanc...

Page 5: ...the weather These instructions must be read and fully understood before commencing the installation If in doubt or in need of further guidance please ring Zip on 0845 602 4533 Installation must only b...

Page 6: ...perature and pressure relief valves should drain via a tundish which should be installed in a visible location and away from any electrical devices The discharge pipe from the tundish should terminate...

Page 7: ...rge pipe should be at least one pipe size larger than the largest individual discharge pipe to be connected If unvented hot water storage systems are installed where discharges from safety devices may...

Page 8: ...duct Ensure that the wall where the unit is to be located is sufficiently strong to support the full weight of the unit see dimensions and capable of accepting suitable fixings Position the Zip Varipo...

Page 9: ...board or any concealed location For guidance please ring Zip Heaters on 0845 602 4533 Plumbing 1 The unit should be provided with a cold water supply via 22mm pipework 2 The water connections are at t...

Page 10: ...Connect the hot water supply pipe to the outlet from the heater 12 Connect the discharge pipe from the tundish Refer to Installation Requirements on page 6 and Typical Installation drawing on page 5...

Page 11: ...open until all air has been purged from the system and water is flowing freely from all outlets 8 Check for leaks and rectify as necessary 9 Check the operation of both the T P relief valve and the E...

Page 12: ...the electrical supply to the unit isolate the water supply and contact a competent person familiar with unvented systems 9 Please note that lime scale deposits form more readily at higher temperatures...

Page 13: ...n discharge ceases Replace thermostat if faulty Continuous water Pressure reducing valve Check with pressure gauge and discharge from not operating correctly replace as necessary the tundish P T relie...

Page 14: ...and allow the unit to drain De Installation To de install the heater 1 Switch off and disconnect the electrical supply 2 Close the mains water supply isolating valve 3 Drain the heater as described i...

Page 15: ...moval cartage and re installation of any component of the appliance if it needs to be returned for repair to Zip or its Distributor This warranty does not cover damage resulting from non operation of...

Reviews: