801525 v3.05 09.20 HT C Com Install Instructions
Page 13 of 16
Section 4
Commissioning
Do not commission your HydroTap until it is ready to be used! The HydroTap is designed to be installed,
commissioned and used within 48 hours. If your HydroTap is left idle before use, a filter change and
sanitisation may be required.
•
Turn ON the water and check for any leaks.
•
Turn the power ON at the power outlet and at the side of the Command Centre.
•
Familiarise yourself with the operation of the Tap, in preparation for use (See User Guide)
•
Follow the Installation instructions below (and review Section C of the User Guide).
•
After commissioning, the system may be customised by selecting further options (refer to the User
Guide)
4.2
-
Filter Flush
4.1
-
Select the Language
Initial Commissioning screen
Language selection screen
!
A new filter cartridge is provided (but NOT fitted), inside the
filter door. Unpack the new filter cartridge and write today’s
date on the label. To install the cartridge, align the key tabs
and insert upwards into the filter head. Turn the cartridge to
the right until it locks in place.
Have a 10L bucket or similar container (not supplied) ready
to hold a quantity of water that will be ejected while the
Filter Flush Mode is in operation. Open the filter access door
on the front of the HydroTap and the filter cartridge will be
exposed. Located to the rear RHS of the cartridge is a flush
line and the flush line stop cock. Place the valve end of the
flush line into the 10L bucket or container.
1
1
2
OPEN
CLOSED
Stop cock operation