802265 v3.05 09.20 HT BCS Compact Commercial Instructions
Page 3 of 32
HydroTap Specifications
Installation Checklist ....................................................................................................................4
General Product Features ............................................................................................................5
Important Safety Instructions .......................................................................................................6
Warnings and Regulatory Information ..........................................................................................7
Major Components and Accessories ...........................................................................................8
Technical Specifications ...............................................................................................................9
Before Installation and Site Requirements ...................................................................................9-10
Installation procedure:
STEP 1 -
Fit the tap to the benchtop or sink, before installing the Command Centre.
(Refer to the Tap installation instructions, supplied with the Tap)
STEP 2 -
Check for adequate ventilation
Section 2 - Ventilation
2.1 - Cut out details ..........................................................................................................11-13
STEP 3
- Install the Booster Heater (if required)
Section 3 - Booster Heater
3.1 - Booster Heater specifications and installation ..........................................................14-16
STEP 4
-
Fit the CO
2
Gas cylinder
Section 4 - CO
2
Cylinder
4.1 - Connect and secure the 2.64kg CO
2
gas cylinder ....................................................17-18
STEP 5
- Install the Command Centre
Section 5 - Command Centre installation
5.1 - External bypass valve ...............................................................................................19
5.2 - Hose and tube fitting .................................................................................................19
5.3 - John Guest fittings ....................................................................................................20
5.4 - Carbonation valve .....................................................................................................20
5.5 - Model BCS 100/75 ....................................................................................................21
5.6 - Model BCSHA 100/75 - AIO Mains ...........................................................................22
5.7 - Model BCSHAV 100/75 - AIO Vented .......................................................................23
5.8 - Model BCSHA 140/75 - 5-in-1 Vented ......................................................................24
STEP 6
- Commission the HydroTap
Section 6 - Commissioning
6.1 - CO
2
Purge .................................................................................................................25
6.2 - Filter Flush ................................................................................................................25
6.3 - Boiling Calibration .....................................................................................................26
6.4 - Booster ......................................................................................................................26
6.5 - Sensor Calibration ....................................................................................................27
6.6 - Command Centre Flush ............................................................................................2/
6.7 - Carbonation Valve Flow Adjustment .........................................................................28
Troubleshooting Table .................................................................................................................29
End of Life Disposal .....................................................................................................................30
Contact Details .............................................................................................................................32
Index