background image

Seite 4 / 10

 

 

Important: 

The setpoint depends on the diaphragm position and must be adjusted according to the assembly position. 

 

The configuration can be sealed using the lateral hole in the setting screw. Factory-sealed devices are set to the 

specified pressure. 

 

Assembly must be performed on both sides (p

1

, primary side and p

2

, secondary side) within non-turbulent flow. To that 

end: 

 - Straight inlet piping of 5 x DN on the primary side and 

 - Straight outlet piping of 10 x DN on the secondary side is recommended 

 

Furthermore, it is recommended that you install one shut-off valve each before and after the pressure regulator to 

simplify any maintenance work. Furthermore, a suitable filter must be installed before the pressure regulator in case of 

dirty gases or if there is a hazard of solid particles. 

 

Avoid pressure shocks after assembly and always open shut-off valves slowly! 

Mounting position (diaphragm) 

Horizontal 

Vertical 

 

Recommended mounting 

position 

 

Recommended mounting 

position 

 

Spring dome on bottom 

side, only on request / dry 

gases 

 

 

Only with option /E, 

(depending on the 

medium) 

Summary of Contents for LPR Series

Page 1: ...1 Intended use 2 3 2 Assembly work on the pressure regulator 2 4 Safety provisions 3 5 Material resistance 3 6 Startup 3 6 1 Before installation 3 6 2 Installation 3 6 3 Assembly position and install...

Page 2: ...replacing parts and or for procuring spare parts 3 Purpose These type of pressure regulators are suitable for various tasks e g inerting containers with inactive gases The degree of protection for th...

Page 3: ...l test The resistance of the materials has to be checked see the corresponding chapter of this operating manual Newly installed pipelines must be fully rinsed clean to eliminate mechanical residues It...

Page 4: ...ight outlet piping of 10 x DN on the secondary side is recommended Furthermore it is recommended that you install one shut off valve each before and after the pressure regulator to simplify any mainte...

Page 5: ...not functional and may even be destroyed If the impulse line is not connected there is also a risk of damaging or destroying the devices depending on the inlet pressure For ZM R15 ZM R25 device types...

Page 6: ...g La pression primaire se situe 2 bar g max 10 bar g p1 bar g p2 mbar g Werkstoff Material of construction Mat riaux de construction Welcher Werkstoff ist ausreichend chemisch best ndig Edelstahl Has...

Page 7: ...ar ZM R ZM R D max 2524 mbar 0 10 50 100 200 N A 5 5 mbar ZM R N ND NDs min 1000 mbar 11 0 mbar 15 3 mbar ZM R N ND NDs min 1000 mbar 56 6 mbar 60 10 mbar ZM R N ND NDs min 1000 mbar 116 16 mbar 120 2...

Page 8: ...ax 2524 mbar 0 10 50 100 200 N A 5 5 mbar ZM R N ND NDs min 1000 mbar 11 0 mbar 15 3 mbar ZM R N ND NDs min 1000 mbar 56 6 mbar 60 10 mbar ZM R N ND NDs min 1000 mbar 116 16 mbar 120 20 mbar ZM R N ND...

Page 9: ...LPRK D Ds max 1000 mbar 24 104 mbar 16 100 mbar LPRK LPRK D Ds max 1000 mbar 34 200 mbar 30 200 mbar LPRK LPRK D Ds max 1000 mbar 34 500 mbar2 3 30 500 mbar2 3 LPRK LPRK D Ds max 1000 mbar 10 50 100...

Page 10: ...mbar 6 16 mbar 2 12 mbar LPR LPR D max 2016 mbar 7 26 mbar 3 22 mbar LPR LPR D max 2026 mbar 9 64 mbar 5 60 mbar LPR LPR D max 2064 mbar 14 124 mbar 10 120 mbar LPR LPR D max 2124 mbar 19 224 mbar 15...

Reviews: