background image

Seite 3 / 10

 

4  Safety provisions 

Any work on or with the device may be performed only by qualified personnel who are familiar with the applicable 

regulations on operating pressure regulators and/or pressure containers. 

 

If disassembling safety equipment is required for installation, it must be assembled and inspected immediately once 

the work has concluded. 

 

Do not exceed the operating pressure. It is specified on the nameplate of each device. 

 

When using the device, the provisions regarding the filling material must be followed. 

 

Natural regulations regarding usage and test intervals must be followed. 

5  Material resistance 

Since the operator chose the material, the supplier cannot provide any guarantees regarding material resistance. It is 

the operator’s responsibility to ensure that the material of the devices, including seals and add-on components (e.g., 

pressure gauges, pilot regulator, etc.) are adequately resistant against the medium. 

6  Startup 

6.1  Before installation 

Before installation, perform a visual inspection on the device to determine any transport damage. The device’s 

performance data must be reviewed (max. inlet pressure, secondary pressure, etc.). 

 

The values noted on the nameplate are the values measured in our functional test. 

 

The resistance of the materials has to be checked (see the corresponding chapter of this operating manual). 

 

Newly installed pipelines must be fully rinsed clean to eliminate mechanical residues. It must be ensured that the 

pressure regulator is connected at the local equipotential bonding, either through an adequate and permanent 

connection to metallic pipes or via a direct connection to local equipotential bonding. 

6.2  Installation 

Always install the low pressure regulator as close as possible to the process tank or consumer within non-turbulent 

flow. 

 

Be mindful of the flow direction! (Marked on the housing with an arrow). Otherwise, there is the risk of damaging 

the pressure regulator. 

6.3  Assembly position and installation 

Take note of the diaphragm installation position! (Horizontal diaphragm or vertical diaphragm). Sealed 

devices are set to the desired pressure according to the ordered position If the devices are configured by the user, 

then this also must take place in the subsequent installation position. 

 

The preferred mounting position and/or position of the diaphragm is as follows according to device type: 

 

-  ZM-R15, 25:  

Horizontal diaphragm housing (vertical: alternatively permissible). 

Assembly with the spring dome facing down is permissible only upon consultation. 

 

-  LPR25:    

Vertical diaphragm housing (horizontal: alternatively permissible). 

Assembly with the spring dome facing down is permissible only upon consultation 

Summary of Contents for LPR Series

Page 1: ...1 Intended use 2 3 2 Assembly work on the pressure regulator 2 4 Safety provisions 3 5 Material resistance 3 6 Startup 3 6 1 Before installation 3 6 2 Installation 3 6 3 Assembly position and install...

Page 2: ...replacing parts and or for procuring spare parts 3 Purpose These type of pressure regulators are suitable for various tasks e g inerting containers with inactive gases The degree of protection for th...

Page 3: ...l test The resistance of the materials has to be checked see the corresponding chapter of this operating manual Newly installed pipelines must be fully rinsed clean to eliminate mechanical residues It...

Page 4: ...ight outlet piping of 10 x DN on the secondary side is recommended Furthermore it is recommended that you install one shut off valve each before and after the pressure regulator to simplify any mainte...

Page 5: ...not functional and may even be destroyed If the impulse line is not connected there is also a risk of damaging or destroying the devices depending on the inlet pressure For ZM R15 ZM R25 device types...

Page 6: ...g La pression primaire se situe 2 bar g max 10 bar g p1 bar g p2 mbar g Werkstoff Material of construction Mat riaux de construction Welcher Werkstoff ist ausreichend chemisch best ndig Edelstahl Has...

Page 7: ...ar ZM R ZM R D max 2524 mbar 0 10 50 100 200 N A 5 5 mbar ZM R N ND NDs min 1000 mbar 11 0 mbar 15 3 mbar ZM R N ND NDs min 1000 mbar 56 6 mbar 60 10 mbar ZM R N ND NDs min 1000 mbar 116 16 mbar 120 2...

Page 8: ...ax 2524 mbar 0 10 50 100 200 N A 5 5 mbar ZM R N ND NDs min 1000 mbar 11 0 mbar 15 3 mbar ZM R N ND NDs min 1000 mbar 56 6 mbar 60 10 mbar ZM R N ND NDs min 1000 mbar 116 16 mbar 120 20 mbar ZM R N ND...

Page 9: ...LPRK D Ds max 1000 mbar 24 104 mbar 16 100 mbar LPRK LPRK D Ds max 1000 mbar 34 200 mbar 30 200 mbar LPRK LPRK D Ds max 1000 mbar 34 500 mbar2 3 30 500 mbar2 3 LPRK LPRK D Ds max 1000 mbar 10 50 100...

Page 10: ...mbar 6 16 mbar 2 12 mbar LPR LPR D max 2016 mbar 7 26 mbar 3 22 mbar LPR LPR D max 2026 mbar 9 64 mbar 5 60 mbar LPR LPR D max 2064 mbar 14 124 mbar 10 120 mbar LPR LPR D max 2124 mbar 19 224 mbar 15...

Reviews: