background image

Zimmer GmbH 

 Im Salmenkopf 5 

 

 77866 Rheinau 

 Germany 

 

 +49 7844 9138 0 

●  

 +49 7844 9138 80 

 www.zimmer-group.com

INSTALLATION AND OPERATING INSTRUCTIONS:

Clamping plate, SPN series

Installation and

Im Salmenkopf 5

Operating 

instructions

77866 Rheinau

SPN series

Germany

DDOC01239

+49 7844 9138 0

Index 0

[email protected]

EN 2021-03-16

www.zimmer-group.com

8.1  Assembly of a zero-point clamping system to the clamping plate

NOTICE

 

For individual assembly, follow the instructions in the installation and operating instructions of the zero-point 

clamping system.

8.2  Assembly of the clamping plate

For the zero-point clamping system, clamping plates 

bo

 are offered. 

These clamping plates are available for two, four or six zero-point 

clamping systems.

The clamping plates are equipped with options for fastening to 

machine tables with T-slots at various distances.

Within the clamping plate, the zero-point clamping systems are 

connected with pneumatic channels. For all zero-point clamping 

systems, the connection takes place at the central connections 

bp

.

 

Before assembly, remove the locking screw 

bq

 in the respective 

connection 

bp

.

bo

bp

bq

Example: 

•  Clamping plate for four zero-point clamping systems

•  Fastening options matched to machine table with 

T-slots at the following distances:

63 mm

100 mm

125 mm

200 mm

250 mm

63

63

63

63

100

100

125

125

200

250

8.3  Checking operational readiness

After the product has been properly installed, the following properties must be checked to verify operational readiness:

•  Check pneumatic connections for leaks by looking and listening

• 

All mounting screws are checked for their prescribed tightening torque

•  Check the product for leaks while it is pressurized by looking and listening

8.4  Disassembly

Disassembly is carried out in the reverse order of that described in Section “Assembly of the clamping plate”.

9.  Maintenance

Maintenance-free operation of the product is guaranteed for up to 750,000 million cycles.

The product must be checked by visual inspection at regular intervals for possible damage and contamination.

The maintenance interval may shorten under the following circumstances:

•  Compressed air purity does not correspond to ISO 8573-1 [4:4:4]

•  Dirty environment

•  Improper use and use that does not comply with the performance data

NOTICE

Even though the product is maintenance-free as mentioned above, perform a regular visual inspection to check for 

function, damage or contamination. 

We recommend a visual inspection at least every 2 weeks or after 5,000 clamping cycles. 

 

Shut down the product immediately if you notice any damage or malfunction.

Dismantling and reassembling the product without authorization may result in complications, as special installation equipment is 

required in some cases.

Zimmer GmbH shall not be liable in the event of unauthorized dismantling and reassembling of the product or in the event of any 

malfunction or damage resulting from this.

10.  Troubleshooting

NOTICE

For error-free function of the product, it is necessary that the contact surface is always completely covered.

► This prevents dirt from penetrating the product and causing malfunctions.

Error/malfunction

Possible cause

Measure

Product does not open

•  Operating pressure is too low

•  Leakage/blockage/pinching of the power 

supply lines

 

Increase operating pressure (4 to 6 bar)

 

Check power supply lines

•  Excess force is acting upon the centering 

pin.

 

Reduce the tensile load or compressive 

load on the product.

•  Clamping piston does not move.

 

Vent the PLUS connection

Long response time (too little 

air is fed in)

•  Valve is too small (product opens after a 

delay)

 

Choose a larger valve accordingly

•  Power supply lines from the valve to the 

product are too long (product opens after 

a delay)

 

Shorten the power supply lines (keep the 

distance from the product to the valve as 

short as possible).

 

Enlarge the cross-section of the power 

supply lines.

Air leak or blow-off noise

•  Connections are leaky.

 

Check the connections.

 

Open/close the product several times.

•  Connecting cables are leaky.

 

Check power supply lines.

Dimensional deviations/chatter 

marks

•  Centering pin is not correctly retracted.

•  Contamination of the product

 

Clean the product.

•  Product worn

 

Completely replace the product.

11.  Transportation/storage/preservation

 

The product must be transported and stored only in the original packaging.

 

If the product has already been installed on the superordinate machine unit, care must be taken during transport to ensure 

that no unintentional movements can occur. Before commissioning and after transport, check all power connections and all 

mechanical connections.

 

If the product is stored for an extended period, the following points are to be observed:

 

Ö

Keep the storage location as dust-free and dry as possible.

 

Clean all components. There must be no contamination left on the components.

 

Close pneumatic connections using suitable covers.

 

Observe the required temperature.

12.  Decommissioning and disposal

INFORMATION

When the product reaches the end of its operational phase, it can be completely disassembled and disposed of.

Completely disconnect the product from the power supply. The product can be disassembled and properly disposed 

of according to material groups.

When disposing of them, observe the locally applicable environmental regulations and codes and regulations for 

disposal.

13.  RoHS declaration

In terms of the EU Directive 2011/65/EU

Name and address of the manufacturer:

Zimmer GmbH

Im Salmenkopf 5, 77866 Rheinau, Germany

+49 7844 9138 0

+49 7844 9138 80

www.zimmer-group.com

We hereby declare that the incomplete machine described below

Product designation:

Clamping plate, pneumatic

Type designation:

SPN series

conforms to the requirements of the directive in its design and the version we put on the market.

Michael Hoch

Rheinau, Germany, 2020-03-31

Authorized representative for compiling 

the relevant technical documents

(Place and date of issuance)

Martin Zimmer

(Legally binding signature)

Managing Partner

14.  REACH declaration

In terms of the EU Regulation 1907/2006

Name and address of the manufacturer:

Zimmer GmbH

Im Salmenkopf 5, 77866 Rheinau, Germany

+49 7844 9138 0

+49 7844 9138 80

www.zimmer-group.com

REACH stands for 

R

egistration, 

E

valuation, 

A

uthorisation and 

R

estriction of 

C

hemicals.

A full declaration of REACH can be obtained from the manufacturer due to the duty to notify in accordance with Art. 33 of the 

REACH regulation ("Duty to communicate information on substances in articles").

Michael Hoch

Rheinau, Germany, 2020-03-31

Authorized representative for compiling 

the relevant technical documents

(Place and date of issuance)

Martin Zimmer

(Legally binding signature)

Managing Partner

15.  Declaration of Conformity

In terms of the EU Machinery Directive 2006/42/EC (Annex II 1 A)

Name and address of the manufacturer:

Zimmer GmbH

Im Salmenkopf 5, 77866 Rheinau, Germany

+49 7844 9138 0

+49 7844 9138 80

www.zimmer-group.com

We hereby declare that the following, identically constructed safety components

Product designation:

Zero-point clamping system, pneumatic

Type designation:

SPN series

conform to the requirements of the 2006/42/EC directive in its design and the version we put on the market.

The following harmonized standards have been used:

Basic health and safety requirements:

DIN EN ISO 12100:2011-03 Safety of machinery – General principles for design – Risk assessment and risk reduction

DIN EN ISO 13849-1/-2 

Safety of machinery – Safety-related parts of control systems

EN 349:1993+A1:2008

Safety of machinery – Minimum gaps to avoid crushing of parts of the human body

A full list of applied standards can be obtained from the manufacturer.

Michael Hoch

Rheinau, Germany, 2020-03-31

Authorized representative for compiling 

the relevant technical documents

(Place and date of issuance)

Martin Zimmer

(Legally binding signature)

Managing Partner

Reviews: