10.2 Checking operational readiness
The motor spindle must be checked before commissioning. The checks that are described here must be carried out before
each instance of commissioning or operation of the motor spindle.
The motor spindle must never rotate or be operated without having carried out the commissioning test described here!
•
Check the tightening torques (motor spindle/mounting piece)
•
Check the power supply (lines and connections)
•
Check the operating parameters
• Check the standstill monitoring
•
Check the function, clamping force and nominal dimensions of the setting dimensions at the tool interface
•
Check the clamping states
• Check the cooling system
• Check the thermistors
• Check the grease distribution