15
10.3 Installing the energy supply
NOTICE
The cables that are used by Zimmer GmbH feature a minimum bending radius of 10 x the outer diameter.
This bending radius must not be undershot!
►
Freely suspended cables must be secured to prevent excessive motion loads or pinching.
►
The contacts of the energy supply must be dry, clean and undamaged at all times.
Ö
Damage to the contacts can result in malfunction of the product.
►
Connect the power supply cable to the
control system of the product.
10.3.1 Pin assignment
pin Color
Function
Explanation
3
2
1
4
5
M12 5-pin plug
1
Brown
+ 24 V DC sensor
IO-Link communication supply
2
White
+ 24 V DC actuator
Actuator supply voltage
3
Blue
GND sensor
0 V DC sensor supply voltage
4
Black
C/Q
IO-Link communication
5
Gray
GND actuator
0 V DC actuator supply voltage
►
Connect the product to the IO-Link master.
►
Ensure the proper voltage supply.
INSTALLATION AND OPERATING INSTRUCTIONS:
GEP2000IL-03/GEP2000IL-43
DDOC01219 / c
EN / 2022-10-10
Zimmer GmbH • Im Salmenkopf 5 •
77866 Rheinau, Germany •
+49 7844 9138 0 • www.zimmer-group.com