ZGR SOLAR STR 250
Operation manual
www.zigor.com
13
Current fire prevention regulations must be met.
Select suitable location to install the inverter, where is not so easy for pedestrian to touch, but consider
easy installation and easy maintenance as well.
Sufficient air changes to disperse the heat produced.
Do not expose the Inverter to gases or corrosive products.
The maximum load bearing capacity
g
4 times of inverter weight (Fig. 4-2).
Fig. 4-2 Wall mounting
4.2.3
Placing in the operating position
Check that the area where the
ZGR SOLAR STR 250
is to be placed is capable of supporting the weight of the
equipment (see section 7).
The
ZGR SOLAR STR 250
must be placed in vertical position (Fig. 4-3). Forward installation or upside down
installation is prohibited.
Fig. 4-3 ZGR SOLAR STR 250 installation angle requirements
Reserve enough clearance around the inverter to ensure su
û
cient space for heat dissipation. The fans are
maintained on the left and right sides of the inverter, and a larger clearance is required.
WARNING
explosion area.
WARNING
Certain parts of the equipment can reach high temperatures, avoid contact with it.