3 INST ALLATION
3.1 Reception of material
Make a visual check that the location is appropriate. This must be clean, without drips and with good
ventilation.
Checking the material
On receiving the material, a visual inspection should be made in order to detect any anomalies that may
have occurred during transport.
List and check all the items indicated on the delivery note. Should any component be missing, notify the
forwarding agent within the established deadline.
Extract all parts from the packaging and examine the unit for any damage caused during transport.
Report any damage to the forwarding agent and ZlGOR.
Check that the material delivered corresponds to the delivery note. Check the manufacturer's label
placed at the rear or on one side of the unit.
Responsibility for the loss or damage of Products shall transfer to the Customer from the moment
ZIGOR, places these at the location indicated by the Customer.
Check the contents of the package. The standard contents must include:
1 Operating Manual
6 sets of pairs of PV connectors
1
1 set of accessories for the assembly frame
3
Fig. 3-1 ZIGOR SOLAR XTR3 Material
NO CLAIMS WILL BE ACCEPTED IF, 24 HOURS FOLLOWING THE DELIVERY OF THE GOODS, NO
NOTIFICATION OF RECEPTION OF MATERIAL IN BAD CONDITIONS HAS BEEN RECEIVED AND IF THIS
CIRCUMSTANCE IS NOT NOTIFIED TO THE FORWARDING AGENT AT THE TIME OF DELIVERY.