![ZIEHL-ABEGG ZA top SM225.40B Original Operating Instructions Download Page 28](http://html.mh-extra.com/html/ziehl-abegg/za-top-sm225-40b/za-top-sm225-40b_original-operating-instructions_933580028.webp)
7. Mount the brake manuel box (A) with two tapping screws M4 (9).
8. Loosen the four hexagon head screws M6 x 8 - 8.8 (H) with a screw wrench SW 10 at the motor
terminal box and remove the terminal box plate (I).
9. Remove the blind plug (J) at the motor connection box.
10. Screw the thermostatic switch (10) with a
tightening torque of 3 Nm
into the intended
thread (K).
A exceeding of the tightening torque leads to the damage of the thermostat switch.
11. Attach the cable gland M16 x 1,5 (11).
12. Put the wires with the insulating tube (F) of the thermostatic switch out of the terminal box from
the motor and put it into the terminal box of the forced ventilation according the illustration.
13. Attach the cable tie (12) as strain relief at the wires with the insulating tube in the forced
ventilation terminal box. Connect the wires according to the wiring diagramm (see chapter
"Electrical installation - Connection forced ventilation).
14. Attach the terminal box plate (H) and fasten with the four hexagon head screws M6 x 8 - 8.8 (I)
with a screw wrench SW 10
2ULJLQDORSHUDWLQJLQVWUXFWLRQV
ZAtop
–
model series SM225.40B
Service and maintenance
A-TBA13_06-GB
Part.-No. 01009090-GB (
(8%'
)
28/72