![Zhone iMarc SLV 9126 Installation Instructions Manual Download Page 30](http://html1.mh-extra.com/html/zhone/imarc-slv-9126/imarc-slv-9126_installation-instructions-manual_3747004030.webp)
30
9126-A2-ZN11-40
Verifying That Data Can Be Passed
Between DBMs
Procedure
1
Select Test, then ISDN Call/PVC Tests
Main Menu
→
Test
→
ISDN Call/PVC Tests
2
Select the link to be tested.
3
Start a Test Call. The Status should be Active.
4
Wait as the originating DBM places the backup call.
The originating unit’s Test LED is on.
5
Select Stop to end the Test Call.
See
Verifying Backup
Setup
in the
iMarc SLV Configuration Reference
for additional
information.
Connecting the COM Port to the Router
If the Modem PassThru feature will be used, the terminal or PC must be disconnected and the
COM port connected to the router’s AUX port. A standard cable can be used. See
Connectors,
Cables, and Pin Assignments
in the
iMarc SLV Technical Description
for additional information.
If the Result is . . .
Then . . .
Frame Relay Link Up
The call was successful.
Frame Relay Link
Suboptimal
Not all links have come up. Verify that the Maximum Link
Rate (Kbps) setting in the ISDN Link Profile is the same at
both ends.
Frame Relay Link Down
The call was unsuccessful. Verify the configuration and
Link Status in the ISDN Link Profile.