![Zhone iMarc SLV 9126 Installation Instructions Manual Download Page 26](http://html1.mh-extra.com/html/zhone/imarc-slv-9126/imarc-slv-9126_installation-instructions-manual_3747004026.webp)
26
9126-A2-ZN11-40
Connecting to a DTE (Router or FRAD)
Procedure
1
Connect one end of the DTE’s V.35 cable to the data port.
2
Plug the other end of the cable into the DTE.
3
Tighten the screws on each side of the connector to secure the cable.
4
Verify that the Port OK LED is on. If it is, the port is set up correctly and is operational. If
not, make sure both ends of the cable are properly seated and secured. Then, check the DTE;
RTS or DTR could be down on the DTE.
5
Check Health and Status messages in the left column of the System and Test Status screen
for messages.
Main Menu
→
Status
→
System and Test Status
— If
System Operational
appears, the port interface is set up correctly and is
operational.
— If not, refer to
Status Information
in the
iMarc SLV Operations Guide
.
NOTE:
When any error conditions are detected, a status message appears along the bottom
right corner of the screen.
POWER
COM
DBM
DSX-1
MDM
NET
DSX
ENET
02-17288
DTE