ZGR SCALABLE 60
– 300 KVA
Manual de operaciones
www.zigor.com
52
Fig. 5-2 Power cable connection
Choose appropriate power cable. (Refer to the table above) and pay attention to the diameter of the connection
terminal of the cable that should be greater than or equal to that of the connection poles.
Fig. 5-3 Connection of the UPS to the load
WARNING
The AC input and the AC bypass supplies must be referenced to the same neutral point.