
ZGR SCALABLE 60
– 300 KVA
Manual de operaciones
www.zigor.com
40
•
Timing daily
Modify the check date, time and check time (10S (default), 10min, EOD) (Fig. 4-52).
Fig. 4-52 Maint/Battery Self-Check/Timing daily submenu
•
Timing weekly
Modify the check date, time and check time (10S (default), 10min, EOD) (Fig. 4-53).
Fig. 4-53 Maint/Autocomprobación de la batería/Timing Weekly submenu
•
Timing Cycle mode
Modify the cycle date and check time (10S (default),10min, EOD) ().
Fig. 4-54 Maint/Battery Self-Check/ Cycle mode submenu