26 V00 Installation and operating instructions
3.
Strip the cable insulation as follows:
Strip the cable insulation by 80mm (as D shown), shorten L1, L2, L3 and N, and
make them 5mm shorter than PE conductor. Then strip each conductor insulation
by 16mm (as C shown).
Insert the bared conductor into the cord end terminal and crimp the contact,
customer needs to prepare the cord end terminals in advance.
Loosen the screws of the lower cover!
•During loosening the screws of the lower cover, it is not necessary to
take off the screws, which can remain on the lower cover and will not
fall off.
Summary of Contents for Zeverlution Pro 33K.
Page 1: ......