PRECAUTIONS IN INSTALLING THE UNIT
• Find a suitable position to install Zero B UV Grande on the wall
• Locate Zero B UV Grande in such a way to have easy access for dispensing
• Zero B UV Grande should be located close to an available tap or water outlet (not exceeding 1meter)
• All units are provided with extra length of tubing, Cut the extra length of tubing which is left after installation
• Wall mounted Zero B UV Grande should be located conveniently where the power outlet of 230 VAC is available
A Location of the unit
• Unit is not to be kept in closed environment. Sufficient space is required for ventilation
• Avoid any kind of high impact on the unit
B System
2
• Systems electrical requirement 230 VAC ± 20 % 5 AMP socket with kg/cm proper earthing point to be made at
the point of installation
• Plumbing requirement
½
“ water line with minimum pressure of 0.5 and maximum of 2
• Ensure the raw water quality meets the required specifications
2
kg/cm
Installation requirement
INSTALLATION
11
12
3/8” White Tube
CPTAP
Ball Valve 3/8”X1/2” Hose
Adaptor with silicon “O”
Ring