10
www.zephyronline.com
INTERNAL BLOWER PREPARATION – VERTICAL DUCTING
1. Attach capacitor box to inside of hood using two
M4*10 screws included with internal blower.
2. Attach green ground wire to ground screw on
hood.
3. Connect 6 pin male connector from capacitor box
to 6 pin female connector on control board box.
4. Place 6” round mounting plate on top of hood
and secure using eight M4*8 screws.
5. Install internal blower into hood.
6. Secure internal blower to hood using four
M4*16 screws included with internal blower.
Installation –
Internal Blower (V
ertical Ducting)
Summary of Contents for CACHE CCA-E30ASX Use
Page 2: ...www zephyronline com...