Page 20 of 24
803341NZ - HydroTap Taps Install Instructions 09.18 v2.11
Installation Instructions - Celsius All-In-One Tap
5.5
Typical Celsius All-In-One Mains Installation with Booster (optional)
Booster
Tee piece and
connector strainer
(supplied)
Booster
RED
CLEAR
BLUE
BRAIDED
USB
CHILLED
OUTLET
MAINS
IN
MIXER
OUT
MIXER
IN
BOILING
OUT
BYPASS
IN
VENT BYPASS
OUT
Note:
- Mains hose length
is 750mm
- Plug and cord
length is 1800mm
Position the under
sink unit close to
the outlet tap, within
reach of the hose
and cord lengths
supplied
Note:
All silicon
tubes must be cut
to size. They must
have a constant fall
back to the unit.