![background image](http://html1.mh-extra.com/html/zell/ac1800/ac1800_operation-manual_3317197017.webp)
16
1 First start-up
1.1 Setting up and switching on
110v 60Hz Power supply must be firmly grounded. If not,it will
cause the weight scale a incorrect operation;it also may cause an
injury to operators from an electric shock.
1. Place Air-Con Service Station to the workplace and lock the front
casters.
Before operation the device must be on a level, flat surface so that
measurement can be made correctly.
2.
Plug in the Air-Con Service Station .
3. Switch on the Air-Con Service Station.it come to the standby mode:
Maintenance of Drier
Summary of Contents for AC1800
Page 1: ...Automobile Air Con ServiceStation AC1800 Operation Manual...
Page 10: ...9 5 Overview of the Air Con Service Station Used oil bottle Pressure gauge for working tank...
Page 15: ...14...
Page 18: ...17 When at standby mode keep pressing...
Page 36: ...35 Press button more than 50ml...
Page 38: ...37 4 Press the button to print or press to confirm and come back to the standby mode...
Page 44: ...43...
Page 48: ...47 the hose cleaning operation will finished automatically and come back to the standby mode...
Page 58: ...57...