30 - EN
Part 3 - Airflow measurement test and
commissioning details
3.1 Test Equipment
Schedule of air flow measurement equipment used (model and serial)
Date of last UKAS calibration
1.
2.
3.
3.3 Air Flow Measurements (extract) - system 3 and 4 only
Room reference
(location of terminals)
Measured Air Flow
High Rate (l/s)
Design Air Flow
High Rate (l/s)
Refer to Table 5.1b ADF
Measured Air Flow
Low Rate (l/s)
Design Air Flow
Low Rate (l/s)
Refer to Table 5.1b in
ADF
Kitchen
Bathroom
En Suite
Utility
Other...
Other...
Other...
3.4 Air Flow Measurements (supply) - system 4 only
Room reference
(location of terminals)
Measured Air Flow
High Rate (l/s)
Design Air Flow
High Rate (l/s)
Refer to Table 5.1b ADF
Measured Air Flow
Low Rate (l/s)
Design Air Flow
Low Rate (l/s)
Refer to Table 5.1b in
ADF
Living Room 1
Living Room 2
Dining Room
Bedroom 1
Bedroom 2
Bedroom 3
Bedroom 4
Bedroom 5
Study
Other...
3.5 Commissioning - systems 3 and 4 only
Have controls been set-up in accordance with the manufacturer’s recommendations?
Yes
No
Have all distribution grilles been locked to prevent un authorised adjustment?
Yes
No
Summary of Contents for ComfoAir Q 350 ST
Page 1: ...Cooling Fresh Air Clean Air Heating Ventilation system Zehnder ComfoAir Q User manual ...
Page 4: ...4 EN ...
Page 33: ...EN 33 Data Activity Initials ...
Page 34: ......
Page 35: ......