Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
25/44
CAN port of the communication gate through the CAN port at the base of the charger. Details on EN-
GATE or ZCS Connext can be found in the specific manual.
For more information and instructions on how to connect the cables, contact ZCS technical service.
The connection is possible using the CAN ports shown in the figure. There are two connectors as it is
possible to connect up to 12 charging stations to the same external device.
Figure 15 - Communication system
When grouping chargers together, for example, in public car parks, a single gate functions as an access
gate for up to 12 chargers. The gate is connected to charger #1 and the other chargers are connected
one by one via network cables between the various CAN ports (Figure 16). The length of the network
cable between the gate and charger #1 should be ≤10m, while the total length of the network cables
between the gate and the farthest charger should be ≤100m.
Figure 16 - Connecting the charging stations